¡¡¡¡abstract: the a/o process has been adopted to treat the wastewater of jiujiang fertilizer plant for nitrogen removal. in case when the specific loads are controlled to 0.23¡«0.50 and 0.023¡«0.040 kg/(kg mlss.d) for cod and nh3-n respectively and the cod/n is controlled to 10-16, the removal ratios of 95%, >85% and >80% have been obtained for cod, nh3-n and tn respectively. also the problems in the operation of this process are discussed.
1¡¡Éè¼Æ¼ò¿ö
¡¡¡¡¾Å½´ó»¯·Ê·ÏË®´¦Àía/o¹¤ÒÕϵͳ²ÉÓÃͬÐÄԲʽµÄÏõ»¯·´Ïõ»¯³Ø£¬ÄÚ¾¶9.5m£¬Íâ¾¶12.7m£¬·´Ïõ»¯ÇøÓÐЧÌå»ý205m3£¬Ïõ»¯ÇøÓÐЧÌå»ý318m3£¬Éè¼Æ½øË®Á¿1200m3/d£¬Éè¼Æ³öˮˮÖʼû±í1¡£
¡¡¡¡¹¤ÒÕÁ÷³ÌÈçͼ1Ëùʾ£¬·ÏË®Ê×ÏȽøÈë·´Ïõ»¯³Ø£¬Óë»ØÁ÷ÎÛÄà¾ÍÆÁ÷ʽ½Á°è»ú»ìºÏ¾ùÔÈ£¬·¢Éú·´Ïõ»¯·´Ó¦(Èô½Á°è»ú·¢Éú¹ÊÕÏ£¬¿É½«Í¨Èë·´Ïõ»¯³ØµÄ¿ÕÆø¹Ü΢¿ª)£¬È»ºóË®¾µ×²¿»ØÁ÷´°½øÈëÏõ»¯³Ø·¢ÉúÏõ»¯·´Ó¦£¬Ïõ»¯ºóµÄË®Ôڹķ綯Á¦×÷ÓÃÏÂÒ»²¿·Öͨ¹ýÉϲ¿»ØÁ÷´°»ØÁ÷µ½·´Ïõ»¯³Ø£¬Ò»²¿·Ö¾ÒçÁ÷Ñßͨ¹ýÖØÁ¦×÷ÓÃÁ÷ÈëÍÑÆø³ØÍÑÆø£¬ÍÑÆøºóµÄË®×îºóÔÚ¶þ³Á³ØÄÚ½øÐÐÄàË®·ÖÀ룬³ÎÇåºóµÄË®¾ÒçÁ÷ÑßÁ÷È뱩Óêµ÷½Ú³Ø£¬¾±ÃÌáÉýÖÁ³¤½£¬ÎÛÄàÒ»²¿·Ö»ØÁ÷£¬Ò»²¿·Ö½øÐÐŨËõÍÑË®ÍâÔË¡£Õû¸öa/o¹¤ÒÕ²ÉÈ¡a¡¢bÁ½¸öϵÁв¢ÁÐÔËÐС£
±í1¡¡Éè¼Æ³öˮˮÖÊ